top of page

OUR NEWS AND INSIGHTS
Blogs
News


Alta Battery Electric Tender: From Design to Delivery
Take a look inside the development of Alta’s first Battery Electric Tender as we wrap up the design phase and move into manufacturing. This short video highlights the early concepts, the engineering challenges we solved along the way, and what this milestone means for the broader rail sector as we move toward a more electrified Australian rail network. <iframe width="1736" height="977" src="https://www.youtube.com/embed/nFDbPwQHSZs" title="Alta Battery Electric Tender: From
Dec 1, 2025


Alta Technology advances Battery Electric Tender trial with Aurizon and Alcoa
26 October 2025 – Alta Battery Technology is delighted to be supporting Aurizon's new agreement with Alcoa to conduct a Battery Electric Tender (BET) trial on Alcoa's Kwinana to Pinjarra route in Western Australia. This milestone is a significant step forward in demonstrating how existing rail assets can be transformed into lower-emission hybrid systems without premature replacement. The Battery Electric Tender is a battery-powered wagon coupled with a modified locomotive, d
Oct 26, 2025


Alta Technology’s PureTraction™ – revolutionising mining fleet decarbonisation
Australia’s mining industry, central to the nation’s economy, is under increasing pressure to decarbonise operations and meet stringent environmental standards. In line with this global shift towards sustainability and reducing carbon footprints, Alta Technology, a pioneer in battery and electrification technologies, has introduced the PureTraction™ suite—A modular electrification system designed specifically for mining haul trucks. This suite offers both retrofitting soluti
Oct 30, 2024


Alta signs deal with Aurizon and ARENA to deliver world-first battery electric tender
Alta Battery Technology , a pioneer in battery technology innovation for power decarbonisation, has entered a collaboration with Aurizon , Australia's largest rail freight provider, and the Australian Renewable Energy Agency (ARENA) to deliver create the world’s first battery capable of connecting machinery to renewables, converting them to a hybrid operation. The project, which has received $9,406,212 funding from ARENA , will see Alta design and construct a prototype batt
Mar 21, 2024
bottom of page