top of page

LOCOMOTIVE RETROFIT

DL019: Battery Electric Locomotive Retrofit

Introduction

GK0.webp

Alta was commissioned to resolve battery, motor, and fire-protection issues on Shanxi Jianlong Steel’s battery-electric shunter conversion project. Drawing on experience from previous retrofit programs, Alta supplied critical electrical systems and engineering support to stabilise performance, improve safety, and bring the locomotive up to operational standard for continuous industrial use.

Alta's Scope of Work

Alta's involvement included the supply and optimisation of:

Technology Snapshot

The locomotive operates with a 700 V battery system delivering up to 1 MW of traction power, ensuring dependable operation under heavy industrial workloads.

Outcome & Significance

Alta’s intervention enabled the locomotive to achieve stable battery performance and reliable traction output, addressing the thermal and safety challenges that limited earlier trials. The project reinforced Alta’s capability to troubleshoot and refine third-party conversions, expanding its role beyond supply to include hands-on technical remediation and system optimisation.

bottom of page